Concrete built for a Panguitch winter
Panguitch is a real town with real winters. We pour the small jobs here during the warm months and build them to handle the cold ones.
Panguitch
Panguitch sits around 6,600 feet in the Sevier River valley, and it is known for cold. Homes here are lived in all year, so the concrete gets used all year too. A front walk that heaves a little more each spring. A driveway panel that has broken up at the street. A back patio that never got poured because nobody would bid on something that size.
Small jobs are a tough sell this far out. A contractor from a bigger town has to cover the drive before the first form goes down, and a full truck carries about ten yards when your walk needs one or two. We handle it by putting several Panguitch jobs on one pour day. One trip, one truck, a handful of neighbors sharing the load. That makes a small pour worth doing.
Pouring in Panguitch
- Cold nights on both ends of summer
- Panguitch can see frost late in spring and early in fall, even after a warm afternoon. Fresh concrete cannot freeze while it cures. We watch the overnight lows, cover new slabs when it gets close, and stop booking pours once fall turns.
- Frost under the slab
- When wet ground freezes it lifts whatever sits on top. A compacted gravel base lets water drain out from under the slab so there is less to freeze. We also cut control joints so that if the slab does move, the crack follows a straight line.
- Go easy on the salt
- It is tempting to salt an icy walk in January. On concrete less than a year old, de-icing salt can make the surface flake. Use sand or grit the first winter. After that the slab is tougher, but salt is still hard on it.
Common jobs in Panguitch
- 1
Sidewalks and paths
Front walks in town see frost heave, and a lifted panel turns into a trip edge.
- 2
Driveway add-ons
Extra parking beside the driveway gets the truck and the trailer off the street for the winter.
- 3
Patios
A back patio gets a lot of use in a short summer, so people want it poured early in the season.
- 4
Repairs
Freeze and thaw opens up small cracks and chips corners, and catching them early keeps water out.
Text a photo from Panguitch.
435·220·5536Text us a photo of the spot and rough measurements. We will tell you what we can from the photo, or come out and take a look. Rather type it out? Use the form.
Panguitch: straight answers
How late in the year can you pour in Panguitch?
It depends on the fall. Once hard frosts show up most nights, we stop, because new concrete needs to cure above freezing. Early fall is usually the cutoff. If your job misses the window, it goes on the list for the first Panguitch pour day in spring.
Will new concrete hold up to a Panguitch winter?
It is built to. We order air-entrained mix, which is made for freeze and thaw, set it on a drained gravel base, and cut joints to control cracking. No concrete is crack proof, but those three things are what help a slab last in cold country.
How do you schedule jobs this far from your shop?
We are based in Colorado City, so a trip to Panguitch usually covers several jobs. We collect jobs around Panguitch, Hatch and the lake, then pick a pour day that covers them. Text a photo any time and we will tell you when the next trip is likely.